🇲🇬

DQE / DPGF (French practice)

Bills of Quantities for Madagascar, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) for Madagascar — using the DQE / DPGF (French practice) standard that local quantity surveyors, contractors and lenders expect, priced in MGA (Ar), with every rate source-cited.

Generate a Madagascar BoQPriced in MGA (Ar) · Free preview, pay 1% to unlock
Measurement standard
DQE / DPGF (French practice)
Document
Devis Quantitatif Estimatif (DQE) / DPGF
Currency
MGA (Ar)

What your Madagascar BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in MGA when you generate your own BoQ.

How it works in Madagascar

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Madagascar & MGA
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced DQE / DPGF (French practice) bill in minutes, ready to download.

Madagascar — frequently asked

What BoQ format is used in Madagascar?+

Madagascar uses the DQE / DPGF (French practice) standard. Your bill is generated in that exact format (locally known as the Devis Quantitatif Estimatif (DQE) / DPGF), priced in MGA.

What currency is my BoQ priced in?+

Every rate and total is priced in MGA (Ar), the currency used in Madagascar. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Madagascar project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Madagascar QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Madagascar build?

Generate a Madagascar BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in MGA
Related