HKSMM4 — Hong Kong Standard Method of Measurement
Bills of Quantities for Macau, done in minutes
Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Macau — using the HKSMM4 — Hong Kong Standard Method of Measurement standard that local quantity surveyors, contractors and lenders expect, priced in MOP (MOP$), with every rate source-cited.
What your Macau BoQ includes
- Preliminaries
- Substructure & foundations
- Superstructure & walling
- Roofing
- Internal finishes
- Services (plumbing & electrical)
- External works
| Description | Unit | Qty |
|---|---|---|
| Foundation trench excavation | m³ | 22.0 |
| Mass concrete strip foundation, C20 | m | 46.0 |
| 230mm masonry walls, common bond | m² | 168.0 |
| Reinforced concrete lintels over openings | m | 24.0 |
| Roof trusses & covering | m² | 142.0 |
| Internal plaster & finishes | m² | 380.0 |
Rates and totals are priced in MOP when you generate your own BoQ.
How it works in Macau
Macau — frequently asked
What BoQ format is used in Macau?+
Macau uses the HKSMM4 — Hong Kong Standard Method of Measurement standard. Your bill is generated in that exact format, priced in MOP.
What currency is my BoQ priced in?+
Every rate and total is priced in MOP (MOP$), the currency used in Macau. You can also choose any other currency at generation.
How much does it cost?+
Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.
How long does it take?+
A typical analysis for a Macau project completes in a few minutes — versus the days or weeks a manual takeoff takes.
Can a quantity surveyor or contractor rely on it?+
The bill is grouped by trade and every unit rate carries a source, so a Macau QS or contractor can check each figure. Treat it as a fast, auditable first-pass.