🇱🇷

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Liberia, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Liberia — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in LRD ($), with every rate source-cited.

Generate a Liberia BoQPriced in LRD ($) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
LRD ($)

What your Liberia BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in LRD when you generate your own BoQ.

How it works in Liberia

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Liberia & LRD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Liberia — frequently asked

What BoQ format is used in Liberia?+

Liberia uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in LRD.

What currency is my BoQ priced in?+

Every rate and total is priced in LRD ($), the currency used in Liberia. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Liberia project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Liberia QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Liberia build?

Generate a Liberia BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in LRD
Related