🇱🇦

SMM-influenced unit-price bill (Southeast Asian practice)

Bills of Quantities for Laos, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Laos — using the SMM-influenced unit-price bill (Southeast Asian practice) standard that local quantity surveyors, contractors and lenders expect, priced in LAK (₭), with every rate source-cited.

Generate a Laos BoQPriced in LAK () · Free preview, pay 1% to unlock
Measurement standard
SMM-influenced unit-price bill (Southeast Asian practice)
Document
Bill of Quantities (BoQ)
Currency
LAK (₭)

What your Laos BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in LAK when you generate your own BoQ.

How it works in Laos

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Laos & LAK
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM-influenced unit-price bill (Southeast Asian practice) bill in minutes, ready to download.

Laos — frequently asked

What BoQ format is used in Laos?+

Laos uses the SMM-influenced unit-price bill (Southeast Asian practice) standard. Your bill is generated in that exact format, priced in LAK.

What currency is my BoQ priced in?+

Every rate and total is priced in LAK (₭), the currency used in Laos. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Laos project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Laos QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Laos build?

Generate a Laos BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in LAK
Related