🇰🇮

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Kiribati, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Kiribati — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in AUD (A$), with every rate source-cited.

Generate a Kiribati BoQPriced in AUD (A$) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
AUD (A$)

What your Kiribati BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in AUD when you generate your own BoQ.

How it works in Kiribati

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Kiribati & AUD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Kiribati — frequently asked

What BoQ format is used in Kiribati?+

Kiribati uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in AUD.

What currency is my BoQ priced in?+

Every rate and total is priced in AUD (A$), the currency used in Kiribati. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Kiribati project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Kiribati QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Kiribati build?

Generate a Kiribati BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in AUD
Related