🇯🇲

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Jamaica, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Jamaica — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in JMD (J$), with every rate source-cited.

Generate a Jamaica BoQPriced in JMD (J$) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
JMD (J$)

What your Jamaica BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in JMD when you generate your own BoQ.

How it works in Jamaica

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Jamaica & JMD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Jamaica — frequently asked

What BoQ format is used in Jamaica?+

Jamaica uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in JMD.

What currency is my BoQ priced in?+

Every rate and total is priced in JMD (J$), the currency used in Jamaica. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Jamaica project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Jamaica QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Jamaica build?

Generate a Jamaica BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in JMD
Related