🇮🇷

Fehrest-Baha unit-price schedule (Iran)

Bills of Quantities for Iran, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Iran — using the Fehrest-Baha unit-price schedule (Iran) standard that local quantity surveyors, contractors and lenders expect, priced in IRR (﷼), with every rate source-cited.

Generate a Iran BoQPriced in IRR () · Free preview, pay 1% to unlock
Measurement standard
Fehrest-Baha unit-price schedule (Iran)
Document
Bill of Quantities (BoQ)
Currency
IRR (﷼)

What your Iran BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in IRR when you generate your own BoQ.

How it works in Iran

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Iran & IRR
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Fehrest-Baha unit-price schedule (Iran) bill in minutes, ready to download.

Iran — frequently asked

What BoQ format is used in Iran?+

Iran uses the Fehrest-Baha unit-price schedule (Iran) standard. Your bill is generated in that exact format, priced in IRR.

What currency is my BoQ priced in?+

Every rate and total is priced in IRR (﷼), the currency used in Iran. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Iran project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Iran QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Iran build?

Generate a Iran BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in IRR
Related