🇮🇸

Elemental cost breakdown (European practice)

Bills of Quantities for Iceland, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Iceland — using the Elemental cost breakdown (European practice) standard that local quantity surveyors, contractors and lenders expect, priced in ISK (kr), with every rate source-cited.

Generate a Iceland BoQPriced in ISK (kr) · Free preview, pay 1% to unlock
Measurement standard
Elemental cost breakdown (European practice)
Document
Bill of Quantities (BoQ)
Currency
ISK (kr)

What your Iceland BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in ISK when you generate your own BoQ.

How it works in Iceland

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Iceland & ISK
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Elemental cost breakdown (European practice) bill in minutes, ready to download.

Iceland — frequently asked

What BoQ format is used in Iceland?+

Iceland uses the Elemental cost breakdown (European practice) standard. Your bill is generated in that exact format, priced in ISK.

What currency is my BoQ priced in?+

Every rate and total is priced in ISK (kr), the currency used in Iceland. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Iceland project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Iceland QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Iceland build?

Generate a Iceland BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in ISK
Related