🇫🇯

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Fiji, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Fiji — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in FJD ($), with every rate source-cited.

Generate a Fiji BoQPriced in FJD ($) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
FJD ($)

What your Fiji BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in FJD when you generate your own BoQ.

How it works in Fiji

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Fiji & FJD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Fiji — frequently asked

What BoQ format is used in Fiji?+

Fiji uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in FJD.

What currency is my BoQ priced in?+

Every rate and total is priced in FJD ($), the currency used in Fiji. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Fiji project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Fiji QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Fiji build?

Generate a Fiji BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in FJD
Related