🇩🇲

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Dominica, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Dominica — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in XCD ($), with every rate source-cited.

Generate a Dominica BoQPriced in XCD ($) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
XCD ($)

What your Dominica BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in XCD when you generate your own BoQ.

How it works in Dominica

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Dominica & XCD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Dominica — frequently asked

What BoQ format is used in Dominica?+

Dominica uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in XCD.

What currency is my BoQ priced in?+

Every rate and total is priced in XCD ($), the currency used in Dominica. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Dominica project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Dominica QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Dominica build?

Generate a Dominica BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in XCD
Related