🇨🇿

Elemental cost breakdown (European practice)

Bills of Quantities for Czech Republic, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Czech Republic — using the Elemental cost breakdown (European practice) standard that local quantity surveyors, contractors and lenders expect, priced in CZK (Kč), with every rate source-cited.

Generate a Czech Republic BoQPriced in CZK () · Free preview, pay 1% to unlock
Measurement standard
Elemental cost breakdown (European practice)
Document
Bill of Quantities (BoQ)
Currency
CZK (Kč)

What your Czech Republic BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in CZK when you generate your own BoQ.

How it works in Czech Republic

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Czech Republic & CZK
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Elemental cost breakdown (European practice) bill in minutes, ready to download.

Czech Republic — frequently asked

What BoQ format is used in Czech Republic?+

Czech Republic uses the Elemental cost breakdown (European practice) standard. Your bill is generated in that exact format, priced in CZK.

What currency is my BoQ priced in?+

Every rate and total is priced in CZK (Kč), the currency used in Czech Republic. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Czech Republic project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Czech Republic QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Czech Republic build?

Generate a Czech Republic BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in CZK
Related