🇭🇷

Elemental cost breakdown (European practice)

Bills of Quantities for Croatia, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Croatia — using the Elemental cost breakdown (European practice) standard that local quantity surveyors, contractors and lenders expect, priced in EUR (€), with every rate source-cited.

Generate a Croatia BoQPriced in EUR () · Free preview, pay 1% to unlock
Measurement standard
Elemental cost breakdown (European practice)
Document
Bill of Quantities (BoQ)
Currency
EUR (€)

What your Croatia BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in EUR when you generate your own BoQ.

How it works in Croatia

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Croatia & EUR
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Elemental cost breakdown (European practice) bill in minutes, ready to download.

Croatia — frequently asked

What BoQ format is used in Croatia?+

Croatia uses the Elemental cost breakdown (European practice) standard. Your bill is generated in that exact format, priced in EUR.

What currency is my BoQ priced in?+

Every rate and total is priced in EUR (€), the currency used in Croatia. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Croatia project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Croatia QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Croatia build?

Generate a Croatia BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in EUR
Related