🇨🇷

Cómputos Métricos y Presupuesto de Obra (Latin American practice)

Bills of Quantities for Costa Rica, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Cómputos Métricos y Presupuesto) (Cómputos Métricos y Presupuesto de Obra) for Costa Rica — using the Cómputos Métricos y Presupuesto de Obra (Latin American practice) standard that local quantity surveyors, contractors and lenders expect, priced in CRC (₡), with every rate source-cited.

Generate a Costa Rica BoQPriced in CRC () · Free preview, pay 1% to unlock
Measurement standard
Cómputos Métricos y Presupuesto de Obra (Latin American practice)
Document
Cómputos Métricos y Presupuesto de Obra
Currency
CRC (₡)

What your Costa Rica BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in CRC when you generate your own BoQ.

How it works in Costa Rica

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Costa Rica & CRC
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Cómputos Métricos y Presupuesto de Obra (Latin American practice) bill in minutes, ready to download.

Costa Rica — frequently asked

What BoQ format is used in Costa Rica?+

Costa Rica uses the Cómputos Métricos y Presupuesto de Obra (Latin American practice) standard. Your bill is generated in that exact format (locally known as the Cómputos Métricos y Presupuesto de Obra), priced in CRC.

What currency is my BoQ priced in?+

Every rate and total is priced in CRC (₡), the currency used in Costa Rica. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Cómputos Métricos y Presupuesto) (Cómputos Métricos y Presupuesto de Obra) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Costa Rica project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Costa Rica QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Costa Rica build?

Generate a Costa Rica BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in CRC
Related