🇨🇦

CIQS Method of Measurement (Canada)

Bills of Quantities for Canada, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities / Elemental Cost Estimate for Canada — using the CIQS Method of Measurement (Canada) standard that local quantity surveyors, contractors and lenders expect, priced in CAD (C$), with every rate source-cited.

Generate a Canada BoQPriced in CAD (C$) · Free preview, pay 1% to unlock
Measurement standard
CIQS Method of Measurement (Canada)
Document
Bill of Quantities / Elemental Cost Estimate
Currency
CAD (C$)

What your Canada BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in CAD when you generate your own BoQ.

How it works in Canada

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Canada & CAD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced CIQS Method of Measurement (Canada) bill in minutes, ready to download.

Canada — frequently asked

What BoQ format is used in Canada?+

Canada uses the CIQS Method of Measurement (Canada) standard. Your bill is generated in that exact format, priced in CAD.

What currency is my BoQ priced in?+

Every rate and total is priced in CAD (C$), the currency used in Canada. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities / Elemental Cost Estimate costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Canada project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Canada QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Canada build?

Generate a Canada BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in CAD
Related