🇨🇲 Cameroon · DQE / DPGF · Work section

Walling & superstructure in a Cameroon bill of quantities

In Cameroon, the walling section of a Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) is measured to DQE / DPGF (French practice). It covers 6 principal groups of work — external walls below and above damp-proof course through to damp-proof course, wall ties and movement joints — and is headed in the bill as "LOT 3 — WALLING & SUPERSTRUCTURE".

Walling & superstructure is one of the sections every Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) in Cameroon is built from. This page sets out what belongs in it, the unit each item is measured in under DQE / DPGF (French practice), the local conventions that change the quantities here, and a worked example for a 150 m² house — plus the errors in this section that actually cost money on site.

Advertisement

What this section covers

  • External walls below and above damp-proof course
  • Internal loadbearing walls and partitions
  • Lintels over all openings
  • Ring beam or wall plate at eaves level
  • Reinforced concrete columns, beams and any suspended slab
  • Damp-proof course, wall ties and movement joints

How each item is measured

ItemUnitMeasurement rule
Wallingm²Measured on the mean face area, stating thickness and bond. Openings over about 0.5 m² are deducted.
Lintelsm or no.Measured as the clear opening width plus bearing each side, stating the section.
Ring beamm³ or mMeasured along the wall it caps, with reinforcement given separately.
Reinforcementkg or tonneMeasured to the bar bending schedule. Laps and spacers are deemed included in the rate.
Formworkm²Measured on the surface of concrete requiring support — a separate and substantial item people forget entirely.
Damp-proof coursemMeasured on the wall length, stating the width.
Advertisement

Local conventions in Cameroon

  • —External walls here are conventionally 225 mm at about 110 units per m²; internal partitions 115 mm at 55 units per m².
  • —Mortar is normally a 1:5 mix, and storey height is taken as 2.7 m.
  • —Structural concrete is a 1:1.5:3 mix, with slabs reinforced at about 80 kg/m³ and columns at 180 kg/m³.

Worked example — 150 m² house in Cameroon

Quantities for this section on a representative single-storey house, computed from Cameroon construction conventions. Rates are deliberately not shown: they move constantly and are priced against your own drawings.

DescriptionQtyUnit
External walling units (bricks/blocks)
115 m² face × 110/m² × 1.05 wastage
13,254no.
Internal walling units
174 m² face × 55/m² × 1.05 wastage
10,042no.
Mortar cement
5 m³ mortar at 1:5
32bags (50 kg)
Mortar sand
1:5 mix, dry factor 1.33
5.6m³
Cement — general concrete
Footings and blinding, 12 m³
76bags (50 kg)
Cement — structural concrete
Slabs, 15 m³ at 1:1.5:3
121bags (50 kg)
River / pit sand
Combined concrete sand requirement
11.6m³
Coarse aggregate (stone)
Combined concrete stone requirement
23.2m³
Reinforcement steel
Slab 80 kg/m³, ring beam 110 kg/m³
1,420kg
Advertisement

What goes wrong in this section

  • —Formwork is frequently omitted from owner-prepared bills and it can rival the cost of the concrete it shapes.
  • —Deducting every small opening wastes measurement time for no commercial benefit; most standards set a threshold precisely so you do not.
  • —Reinforcement quantities from rules of thumb are for budgeting only. A structural engineer's schedule governs — this is not a section to guess on.

Get every section measured, not just this one

Upload your dimensioned drawings and get a complete bill of quantities (devis quantitatif estimatif) in the DQE / DPGF format, priced in XAF (FCFA), with every rate source-cited.

Generate my Cameroon BoQ

Walling & superstructure — frequently asked

What goes into the walling section of a bill of quantities in Cameroon?

+

External walls below and above damp-proof course; Internal loadbearing walls and partitions; Lintels over all openings; Ring beam or wall plate at eaves level; and 2 further groups of work. Under DQE / DPGF each is described, measured in its own unit, and priced separately so the total is auditable line by line.

What units is walling & superstructure measured in?

+

Walling in m², Lintels in m or no., Ring beam in m³ or m, Reinforcement in kg or tonne. Getting the unit right matters more than getting the quantity precisely right — a contractor can adjust a quantity, but cannot price an item measured in the wrong unit at all.

How is walling & superstructure different in Cameroon from elsewhere?

+

External walls here are conventionally 225 mm at about 110 units per m²; internal partitions 115 mm at 55 units per m².

What is the most common costly mistake in this section?

+

Formwork is frequently omitted from owner-prepared bills and it can rival the cost of the concrete it shapes.

How do I get this section measured for my own project?

+

Upload your dimensioned drawings to Enormous Buildings. The bill is produced in the DQE / DPGF format, grouped by section with walling & superstructure priced in XAF (FCFA), and every unit rate carries a source so a Cameroon quantity surveyor can check it.

The other sections of a Cameroon bill

Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.