🇧🇮

DQE / DPGF (French practice)

Bills of Quantities for Burundi, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) for Burundi — using the DQE / DPGF (French practice) standard that local quantity surveyors, contractors and lenders expect, priced in BIF (FBu), with every rate source-cited.

Generate a Burundi BoQPriced in BIF (FBu) · Free preview, pay 1% to unlock
Measurement standard
DQE / DPGF (French practice)
Document
Devis Quantitatif Estimatif (DQE) / DPGF
Currency
BIF (FBu)

What your Burundi BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in BIF when you generate your own BoQ.

How it works in Burundi

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Burundi & BIF
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced DQE / DPGF (French practice) bill in minutes, ready to download.

Burundi — frequently asked

What BoQ format is used in Burundi?+

Burundi uses the DQE / DPGF (French practice) standard. Your bill is generated in that exact format (locally known as the Devis Quantitatif Estimatif (DQE) / DPGF), priced in BIF.

What currency is my BoQ priced in?+

Every rate and total is priced in BIF (FBu), the currency used in Burundi. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Burundi project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Burundi QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Burundi build?

Generate a Burundi BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in BIF
Related