🇧🇬

Elemental cost breakdown (European practice)

Bills of Quantities for Bulgaria, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Bulgaria — using the Elemental cost breakdown (European practice) standard that local quantity surveyors, contractors and lenders expect, priced in BGN (лв), with every rate source-cited.

Generate a Bulgaria BoQPriced in BGN (лв) · Free preview, pay 1% to unlock
Measurement standard
Elemental cost breakdown (European practice)
Document
Bill of Quantities (BoQ)
Currency
BGN (лв)

What your Bulgaria BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in BGN when you generate your own BoQ.

How it works in Bulgaria

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Bulgaria & BGN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Elemental cost breakdown (European practice) bill in minutes, ready to download.

Bulgaria — frequently asked

What BoQ format is used in Bulgaria?+

Bulgaria uses the Elemental cost breakdown (European practice) standard. Your bill is generated in that exact format, priced in BGN.

What currency is my BoQ priced in?+

Every rate and total is priced in BGN (лв), the currency used in Bulgaria. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Bulgaria project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Bulgaria QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Bulgaria build?

Generate a Bulgaria BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in BGN
Related