🇧🇭

POMI — Principles of Measurement International (RICS)

Bills of Quantities for Bahrain, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Bahrain — using the POMI — Principles of Measurement International (RICS) standard that local quantity surveyors, contractors and lenders expect, priced in BHD (.د.ب), with every rate source-cited.

Generate a Bahrain BoQPriced in BHD (.د.ب) · Free preview, pay 1% to unlock
Measurement standard
POMI
Document
Bill of Quantities (BoQ)
Currency
BHD (.د.ب)

What your Bahrain BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in BHD when you generate your own BoQ.

How it works in Bahrain

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Bahrain & BHD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced POMI bill in minutes, ready to download.

Bahrain — frequently asked

What BoQ format is used in Bahrain?+

Bahrain uses the POMI — Principles of Measurement International (RICS) standard. Your bill is generated in that exact format, priced in BHD.

What currency is my BoQ priced in?+

Every rate and total is priced in BHD (.د.ب), the currency used in Bahrain. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Bahrain project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Bahrain QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Bahrain build?

Generate a Bahrain BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in BHD
Related