🇦🇬

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Antigua and Barbuda, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Antigua and Barbuda — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in XCD ($), with every rate source-cited.

Generate a Antigua and Barbuda BoQPriced in XCD ($) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
XCD ($)

What your Antigua and Barbuda BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in XCD when you generate your own BoQ.

How it works in Antigua and Barbuda

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Antigua and Barbuda & XCD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Antigua and Barbuda — frequently asked

What BoQ format is used in Antigua and Barbuda?+

Antigua and Barbuda uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in XCD.

What currency is my BoQ priced in?+

Every rate and total is priced in XCD ($), the currency used in Antigua and Barbuda. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Antigua and Barbuda project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Antigua and Barbuda QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Antigua and Barbuda build?

Generate a Antigua and Barbuda BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in XCD
Related