🇦🇴

Mapa de Quantidades (Portuguese-language practice)

Bills of Quantities for Angola, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) for Angola — using the Mapa de Quantidades (Portuguese-language practice) standard that local quantity surveyors, contractors and lenders expect, priced in AOA (Kz), with every rate source-cited.

Generate a Angola BoQPriced in AOA (Kz) · Free preview, pay 1% to unlock
Measurement standard
Mapa de Quantidades (Portuguese-language practice)
Document
Mapa de Quantidades / Mapa de Medições
Currency
AOA (Kz)

What your Angola BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in AOA when you generate your own BoQ.

How it works in Angola

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Angola & AOA
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Mapa de Quantidades (Portuguese-language practice) bill in minutes, ready to download.

Angola — frequently asked

What BoQ format is used in Angola?+

Angola uses the Mapa de Quantidades (Portuguese-language practice) standard. Your bill is generated in that exact format (locally known as the Mapa de Quantidades / Mapa de Medições), priced in AOA.

What currency is my BoQ priced in?+

Every rate and total is priced in AOA (Kz), the currency used in Angola. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Angola project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Angola QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Angola build?

Generate a Angola BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in AOA
Related